
Telkoor 01-80328L15
Telkoor Power Supply 01-80328L15, new from Motorola. Order online at the published price, or ask GDS for help matching this part to your installed equipment.
$240.00 USD
2-week lead timePart number: 01-80328L15
Category: Power Supply
New, from Motorola. Typical lead time is about 2 weeks.
Unused equipment can be returned within 30 days, with no restocking fee.
Tax-exempt? Upload your exemption certificate at checkout. Paying by purchase order? Request a quote.
Call: 480-461-3401
Email: sales@gbl-data.com
Compatibility
- Match the full part number and revision suffix on your installed label.
- Check the controller platform, power and slot requirements.
- Send GDS a photo of the label if you want the fit confirmed before you order.
Common Uses
- Power supply replacement for remote RTU panels
- Spares support for water, irrigation, and utility telemetry sites
- Panel refresh projects where voltage compatibility must be verified
Procurement Notes
- Online orders ship UPS Ground: $15 per item, free on orders of $1,000 or more.
- Need a formal quotation for a purchase order or bid? Request a quote with the part numbers and quantities.
GDS Support for 01-80328L15
ConditionNew, from Motorola
Lead timeTypical lead time is about 2 weeks.
WarrantyAsk about Motorola warranty coverage for this equipment. GDS does not provide a separate warranty.
Global Data Specialists supports Motorola ACE3600 and legacy SCADA systems with part verification, panel review, repair planning, and field integration guidance before purchase.
Review our return and warranty information and shipping policy before ordering.
Related Insights
Motorola SCADA
Motorola ACE3600 Integration Services →
Planning ACE3600 integration, including MOSCAD migration, system changeover, and ongoing support.
Motorola SCADA
MOSCAD RTU Repair and Replacement →
Keeping legacy MOSCAD RTUs in service with repair or replacement plans that reduce downtime and keep the existing field wiring.
Motorola SCADA
RTU Panel Design for Remote Telemetry and Control →
What good RTU panel design looks like for remote SCADA sites: power budgets, surge protection, comms, and maintainability.